The Mumbai-Ahmedabad Bullet Train Project 2025 marks India’s entry into the era of high-speed rail travel, promising to drastically cut travel time between Mumbai and Ahmedabad. Implemented by the National High Speed Rail Corporation Limited (NHSRCL) with technical assistance from Japan, the project introduces Shinkansen technology for the first time in India. This ambitious initiative is not just about speed—it represents a major leap in infrastructure, technology transfer, and passenger comfort standards.
Table of Contents
Project Overview

The bullet train will connect Mumbai in Maharashtra with Ahmedabad in Gujarat, covering a distance of approximately 508 km. Designed to run at a top operational speed of 320 km/h, the travel time is expected to be reduced to just 2–3 hours compared to the current 6–7 hours by conventional trains.
-
Total Stations: 12
-
Technology: Japanese E5 Series Shinkansen
-
Operational Speed: 320 km/h
-
Total Project Cost: ₹1.1 lakh crore (jointly funded by India and Japan)
-
Completion Target: 2026 (trial runs starting in 2025)
Key Milestones Achieved in 2025
The year 2025 is a landmark for the Mumbai-Ahmedabad Bullet Train as it enters the speed trial and testing phase. Several important developments have been reported:
-
Viaduct Completion: Over 60% of the viaduct structure has been completed.
-
Tunnel Drilling Progress: The undersea tunnel between Thane and Virar is in its advanced stage.
-
Track Laying: First stretch of track-laying completed in Gujarat for trial runs.
-
Speed Trials: Testing at 320 km/h on completed sections planned for mid-2025.
-
Stations in Gujarat: Most stations in Gujarat are structurally ready, awaiting interior work.
Travel Experience & Passenger Facilities
The bullet train aims to redefine Indian railway travel with world-class passenger amenities:
-
Spacious Seating: Reclining seats with ample legroom.
-
Onboard Wi-Fi: High-speed internet for uninterrupted browsing.
-
Food & Beverage Service: Japanese-style bento meals and Indian cuisine options.
-
Disabled-Friendly Coaches: Dedicated facilities for differently-abled passengers.
-
Digital Ticketing: Fully contactless ticketing and boarding system.
Expected Fares & Travel Time
The Mumbai-Ahmedabad Bullet Train will have multiple fare categories similar to airline classes.
Class Type | Approx Fare (One Way) | Facilities |
---|---|---|
Standard Class | ₹3,000 – ₹3,500 | Comfortable seating, basic amenities |
Executive Class | ₹6,000 – ₹7,000 | Extra legroom, luxury meals, premium services |
Travel Time:
-
Non-stop service: Around 2 hours
-
Services with stops: Around 2 hours 45 minutes
Economic & Environmental Impact
The project will bring significant benefits:
-
Job Creation: Over 90,000 direct and indirect jobs during construction and operation.
-
Boost to Tourism: Faster travel between Maharashtra and Gujarat will boost business and leisure tourism.
-
Reduction in Road Traffic: Encourages shift from road/air to high-speed rail, reducing carbon emissions.
-
Technology Transfer: Brings Japanese rail technology and expertise to India.
Project Challenges
While progress is steady, a few challenges remain:
-
Land Acquisition: Delays in Maharashtra have impacted timelines.
-
Cost Escalation: Due to inflation and currency fluctuations.
-
Construction Complexity: Undersea tunnel and elevated viaduct sections are engineering challenges.
Expected Launch Date
While the original launch target was 2023, delays have shifted the operational date. Current updates suggest:
-
Trial Runs: Mid to late 2025 in Gujarat section.
-
Full Launch: Expected in 2026, with partial operations possible if Gujarat section is ready earlier.
How to Book Tickets in the Future
Once operational, ticket bookings will be available through:
-
IRCTC Website & App
-
Dedicated Bullet Train App
-
Station Counters & Kiosks
-
Third-Party Travel Platforms
Tips for Future Passengers
-
Book in advance for lower fares during promotional periods.
-
Choose Executive Class for long business trips for added comfort.
-
Plan trips during non-peak hours to enjoy faster boarding and less crowding.
FAQs
What is the maximum speed of the Mumbai-Ahmedabad Bullet Train?
The train will operate at 320 km/h, with a design speed of 350 km/h.
How much time will it take from Mumbai to Ahmedabad?
Non-stop service will take about 2 hours, and services with stops around 2 hours 45 minutes.
When will the bullet train start in India?
Trial runs are expected in 2025, with full operations likely by 2026.
What technology is being used?
Japanese Shinkansen technology (E5 Series) is being adapted for Indian conditions.
Will the ticket prices be affordable?
Fares are expected to be competitive with low-cost airlines for the same route.
Click here to know more.